Pakistan Metallurgical Plant

Executive Summary

Project Name: Pakistan Metallurgical Plant

Location: Karachi, Sindh, Pakistan

Type: Construction

Overhaul of second type of Blast Furnace №2

Blast furnace №2 has volume of 1033 m³. Overhaul of second type was made in 2002.

The project included not only repair, but also modernization of separate systems of blast furnaces. The newest automatics of the second level based on the equipment of the American company "Schneider" was installed and put into operation, and it allowed to automate controlling process of blast furnace's work completely.

Repair and modernization of the waste heat boiler of BOF shop

Repair of HRSG of 130 ton converter was made turnkey in 1998.

This description should be only used as an example of a successfully completed project by Russian companies and specialists.


Other Projects

Plant for the production of cast iron

Development of project documentation of installing of gas cleaning unit behind the recovery boiler, including gas exhaust ducts from the recovery boiler to gas purification and from gas cleaning up to ...

Products for the company Fuchs

Manufacture of metal structures and equipment for electric steel furnaces and ladle furnace unit. Period of service: 1998-1999. This description should be only used as an example of a successfully ...

Metallurgical Plant of full cycle

Construction of agglomeration plant №3 with capacity of 3,611,000 tonnes of sinter per year, agglomachine with sintering area of 408 sq.m. Capacity: performance, achieved in 2013, is 3.4 million tons ...

Find us on:

Copyright © 2018 Rustranstek

info@rustranstek.com